Error message

  • Deprecated function: The each() function is deprecated. This message will be suppressed on further calls in menu_set_active_trail() (line 2404 of /home3/albee/public_html/includes/menu.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6570 of /home3/albee/public_html/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6570 of /home3/albee/public_html/includes/common.inc).
  • Deprecated function: implode(): Passing glue string after array is deprecated. Swap the parameters in drupal_get_feeds() (line 394 of /home3/albee/public_html/includes/common.inc).

Silay-Victorias highway gets P800M



Thursday, December 21, 2017
BY CARLA GOMEZ

The economic highway being built from Silay City to Victorias City is expected to be almost totally completed next year with about P800 million allocated for 2018, Rep. Alfredo Abelardo Benitez (Neg. Occ., 3 rd District) said yesterday.

With its completion, he said, travel time from Bacolod City to Victorias will only be 17 minutes.

Benitez pointed out that the Bacolod Silay Airport Access Road has brought down travel time from Bacolod to Silay to 10 minutes, and travel from Silay to Victorias once the highway is completed will only be 7 minutes.

The economic highway from Silay City will pass through EB Magalona before reaching Victorias City, he said.

It will be a model 4-lane highway of about 12kilometers with solar lights, a bike lane, and a proper pathway for pedestrians, Benitez said.*CPG

@senso for A BETTER BACOLOD

Ang isa sa akon mga handom para sa Bacolod.


Ako ang kapitan sg sini nga barko. Indi ini magkadto sa wala ukon sa tuo, kundi derecho sa direksyon sang pagbag-o sang gobyerno para sa kaayuhan sang Bacolodnon.